Deploy anywhere

Tow it, lift it or drop it. Power anywhere.

Every MAX arrives ready to work and moves when the job does: permanent, semi-permanent or fully mobile, on-grid or off-grid.

Deployment

Three ways to get power on site.

No concrete pad, fencing or crane. Every unit is pre-commissioned in our factory and running in minutes.

Allye MAX300: Tow and Go
MAX300

Tow and Go

<3.5t

Under 3.5t on its integrated trailer, towed on a standard licence.

Allye MAX500: Lift into place
MAX500

Lift into place

10ft

Compact 10ft footprint, lifted into place on chains and hooks.

Allye MAX1000 and MAX1500: Drop and Go
MAX1000 and MAX1500

Drop and Go

<2 min

Lowered from a hooklift truck in under two minutes, no crane.

Moves with the work

One unit, many jobs.

MAX300 is under 2m and fits a parking bay, so stationary use needs no planning permission.

Permanent

Behind the meter on a constrained site, earning while it waits.

Semi-permanent

Bridges the wait for a new grid connection, then moves on.

Fully mobile

Moves between sites, sets and events as the work moves.

On-grid and off-grid

One system, two ways to work.

The same unit works as a buffer on a constrained connection or as a generator where there is no grid, and moves between the two.

On-grid · Stationary

Battery as a buffer

  1. Charge off-peak or from solar.
  2. Boost peak power above your limit.
  3. Back up the site in under 40ms.
  4. Earn from grid flexibility markets.
Off-grid · Mobile

Battery as a generator

  1. Charge from DC, a MAX or a generator.
  2. Power quietly, zero local emissions.
  3. Top up from a generator if needed.
  4. Save fuel, run hours and emissions.

Transport

Transport and paperwork simplified.

The rule

Battery storage on the road is a Class 9 dangerous good, with paperwork on every move.

What we did

With DfT, VCA and a safety adviser, each MAX is classified UN3536, with unmodified OEM packs.

What it means for you: hire customers just display the UN3536 plate and Class 9 label, with no wider ADR obligations or paperwork.

Allye MAX500 on an industrial estate

Power on site in days, not years.

Tell us about your site and we'll recommend the MAX and the way to deploy it.

sales@allye.com+44 (0)20 805 06560

Your site

Half-hourly meter data helps us model your site. Email it to sales@allye.com after you submit.

We use these details only to reply to your enquiry.