Skip to content

About Allye

An ally for the grid, the people and the planet.

Say it

Allye

/ˈæl.aɪ/ AL-eye

We are an ally with a silent E. Allye is said like ally, and the E stands for the things we work for.

E

Energy

The product, and what it delivers.

E

Environment

The purpose behind what we build.

E

Electric

EV batteries and electric transport.

E

Economy

Reuse costs less than buying new.

E

Everyone

The people we make our promise to.

Our story

Two forces are colliding.

The grid can't connect new demand fast enough, and EV batteries are reaching the end of their first life with most of their capacity left. Allye puts the second to work on the first.

We take battery packs from the EVs already on our roads, keep their automotive battery management and liquid cooling, and build them into MAX: flexible energy storage that boosts a constrained connection, replaces diesel generators and charges electric vehicles. First life on the road. Next life on the grid.

Allye engineers assembling a MAX in London

Designed and built in Britain

From our 14,500 sq ft facility in London.

Every MAX is designed, engineered and assembled in London, with over 90% UK-sourced components. Our UK engineering team monitors and supports every unit, because they built it.

>20Systems deployed across sectors
~10MWhInstalled operating capacity
£3mRaised in venture capital funding
>90%UK-sourced components

Mechanical

Electrical

Controls

Data science and cloud

The Allye team in the London facility
The Allye workshop

Allies

Backed by

Alpha Future FundsElbow BeachFree ElectronsInnovate UKPlug and PlayThird Derivative

Work with us.

Customers, partners and investors: tell us what you're working on.

sales@allye.com+44 (0)20 805 06560

Your site

Half-hourly meter data helps us model your site. Email it to sales@allye.com after you submit.

We use these details only to reply to your enquiry.