Skip to content

MEV200 · Moveable rapid charger

200kW without the grid upgrade.

Rapid DC charging from a battery that recharges on the supply your depot already has. Charging within hours, upgradeable on site.

200kWDC rapid charging
155kWhBattery capacity
HoursFrom delivery to charging
7 to 9Vehicles a day on a 63A supply

Why MEV200

Rapid charging, without the grid upgrade

  • Rapid charging from one compact unit
  • Runs on a 16A to 125A three-phase supply
  • Upgrade on site, no new groundworks
  • Moveable if your depot moves

Best for: Depots with vans, cars and pool vehicles that return to base, on a supply of 32A three-phase or less.

Allye MEV200

Specification

MEV200 technical specification

Specification
DC charging power200kW
Maximum to one vehicleUp to 200kW to an 800V vehicle, about 160kW to a 400V vehicle
Charging connectorsTwo CCS2, on fold-away arms
Battery capacity155kWh
Architecture800V, serving 400V and 800V vehicles
Grid supply16A to 125A three-phase, at least 32A recommended; single-phase option
Throughput7 to 9 vehicles a day on a 63A supply over eight hours, at 55 to 70kWh each
Payment and accessContactless card terminal, RFID, help button
ConnectivityOCPP 1.6J and 2.0.1, ISO 15118 Plug and Charge, MID-certified metering
Lighting and camerasLights on approach, with security cameras
AccessibilityDesigned to PAS 1899

All specifications are subject to change without notice.

The MEV range

Installation, lifetime cost and ways to buy.

Explore the MEV range

FAQ

Questions buyers ask

What supply does MEV need?

MEV runs on a three-phase supply from 16A to 125A as standard, with a single-phase option for sites where daily energy use is low. The supply sets how quickly MEV recharges, so we recommend at least 32A three-phase for a full overnight recharge.

How many vehicles can one MEV charge in a day?

On a 63A supply over an eight-hour day, one MEV is designed to serve 7 to 10 vehicles at 55 to 70kWh each. Over a day, the supply sets throughput; the battery sets how fast each vehicle charges.

Does MEV need planning permission?

MEV is designed to fit within permitted development at depots and car parks in England, subject to site checks. Rules differ in Wales, close to homes and on the street. We check your site before you order and help with any application, but we can't promise the outcome.

Should I choose MEV or MAX?

If the charger stays put at your depot and only ever charges vehicles, choose MEV. If the energy needs to move, power a site, feed a row of separate chargers or be towed on a standard car licence, choose MAX. Many fleets will use both.

Can I move MEV if my depot moves?

Yes. MEV is fixed in use, bolted to a flush plinth, but it can be unbolted and lifted out by forklift or crane and re-sited, with minimal cost.

Talk to us about the MEV200.

Tell us your supply, your vehicles and how long they stand at base. We'll size the MEV, check the siting and price it outright or as a monthly service.

  1. Your supply size, or a photo of your main fuse board
  2. Vehicle numbers, battery sizes and dwell times
  3. A site plan or address so we can check siting

sales@allye.com+44 (0)20 805 06560

Your site or depot

Half-hourly meter data helps us model your site. Email it to sales@allye.com after you submit.

We use these details only to reply to your enquiry.