J&M Murdoch
DC fast charging from a 32A supply.
£300kgrid upgrade deferred, live in a day
The challenge
What they faced
J&M Murdoch wanted to electrify its depot fleet, but its site supply could not run DC fast chargers. The alternative was a grid upgrade costing around £300k and a long wait for the connection.
What we deployed
How MAX solved it
A stationary MAX300 charges from a 32A supply and buffers satellite DC fast chargers from Chargepoly, delivering high power whenever vehicles plug in. It was installed and running in a day.
£300kgrid upgrade deferred
1 dayto deploy
32Asupply is all the depot needed

"Allye's battery install was quick and seamless, enabling us to install DC fast EV chargers on site without waiting years for a grid connection."Andrew Murdoch, J&M Murdoch



Related
Read more
SolutionCharge your fleet.
Skip the grid upgrade.SolutionStay under your limit.
Stay open.ProductMAX300
Big power that tows anywhere
Skip the grid upgrade.SolutionStay under your limit.
Stay open.ProductMAX300
Big power that tows anywhere

Also see · Allye MEV
Explore MEVCharges your fleet where it parks. A battery-buffered rapid charger built on the same platform, for depots that need charging without a grid upgrade.
Want results like these?
Tell us about your site or fleet and we'll model the savings before you commit.
sales@allye.com+44 (0)20 805 06560