J&M Murdoch
DC fast charging from a 32A supply.
£300kgrid upgrade deferred, live in a day
The challenge
What they faced
J&M Murdoch wanted to electrify its depot fleet, but its site supply could not run DC fast chargers. The alternative was a grid upgrade costing around £300k and a long wait for the connection.
What we deployed
How MAX solved it
A stationary MAX300 charges from a 32A supply and buffers satellite DC fast chargers from Chargepoly, delivering high power whenever vehicles plug in. It was installed and running in a day.
£300kgrid upgrade deferred
1 dayto deploy
32Asupply is all the depot needed

"Allye's battery install was quick and seamless, enabling us to install DC fast EV chargers on site without waiting years for a grid connection."Andrew Murdoch, J&M Murdoch



Want results like these?
Tell us about your site and we'll model the savings before you commit.
sales@allye.com+44 (0)20 805 06560