Skip to content

Roadchef

Peak support that keeps the motorway services open.

£120ksaved in year one from peak support
CustomerRoadchef
SectorMotorway services
LocationEngland
SystemMAX300 · On-grid

The challenge

What they faced

Retail, a hotel and EV charging share a fixed 315A supply. At the busiest times, combined demand breached the limit and tripped the site, cutting power for up to 4 hours at a cost of around £10,000 each time.

What we deployed

How MAX solved it

A MAX sits behind the meter as a buffer between the grid and the site. Allye software watches site load around the clock; MAX adds power before demand hits the limit, then recharges in quieter hours.

12trips avoided by peak shaving in year one
£120ksaved in year one, £1.44m over the 12-year battery life
0upgrade needed to the incoming supply

Want results like these?

Tell us about your site and we'll model the savings before you commit.

sales@allye.com+44 (0)20 805 06560

Your site

Half-hourly meter data helps us model your site. Email it to sales@allye.com after you submit.

We use these details only to reply to your enquiry.