Collins Earthworks

Electric trucks charged between quarry and site.

£2,500 a weeksaved in diesel on electric trucks
CustomerCollins Earthworks
SectorConstruction
LocationDerbyshire, England
SystemMAX1000 · On and off-grid

The challenge

What they faced

Collins Earthworks is electrifying its fleet, but its electric trucks run between a quarry and site where grid capacity is limited. A grid upgrade would have cost over £1m, and charging from diesel would defeat the point.

What we deployed

How MAX solved it

A MAX1000 with integrated DC fast charging runs from a 125A supply, storing energy steadily and charging electric trucks at high power on demand. It drops from a hooklift in under two minutes, so it moves as the work moves.

£2,500saved per week in diesel
125Asupply, where an upgrade would have cost over £1m
<2 minto deploy from a hooklift truck
"The MAX1000 delivers exactly what we need: reliable, high-power charging that can be deployed at our various work sites without extensive infrastructure upgrades."
David Collins, Managing Director, Collins Earthworks

Want results like these?

Tell us about your site and we'll model the savings before you commit.

sales@allye.com+44 (0)20 805 06560

Your site

Half-hourly meter data helps us model your site. Email it to sales@allye.com after you submit.

We use these details only to reply to your enquiry.