Skip to content

Your fleet is ready to go electric. Your grid connection isn't.

Charge your fleet. Skip the grid upgrade.

Rapid charging from the supply you already have: MEV where your fleet parks, MAX anywhere, up to 1.28MW.

The problem

The grid is the bottleneck, not the vehicles

Fleets need a lot of power for a few hours. Grid upgrades are sized, priced and timed for neither.

On and off-grid Depots, hubs, vans, trucks and buses

Years to wait

New connections take 1 to 3 years, and up to 15 for some fleets.

Costly upgrades

UK site upgrades cost £150k to £3m, averaging around £500,000.

Short, sharp peaks

Vehicles charge in tight windows, so high power is needed briefly.

Diesel stopgaps

Generators bridge the gap at a cost, and undo the point of going EV.

How it works

A buffer between the grid and your vehicles

MAX stores energy slowly from a small supply and delivers it fast to vehicles.

Store

Charge steadily from three- or single-phase supplies, from 16A.

Charge

Two DC outlets deliver 60kW to 1.28MW, plus AC, to any vehicle.

Move

Redeploy as depots change, with no pad, fencing or groundworks.

Three ways to charge

A dedicated charger at the depot, a buffer for your chargers, or charging anywhere.

Allye MEV chargers in a van depot
MEV · Battery-buffered charging

Charges your fleet where it parks

MEV is a battery-buffered rapid charger that stays put at the depot. It recharges from the supply you already have and delivers up to 300kW of DC charging.

Allye MAX300 charging vans from its integrated chargers
MAX · Battery energy storage

Powers anything, anywhere

MAX stays in one place to buffer your chargers, or moves with the work to charge where there is no grid. Four systems from 328kWh to 1.5MWh, with up to 1.28MW of integrated DC charging.

Allye MAX300 at J&M Murdoch beside a DC charger and an electric skip lorry
Stationary · On-grid

Buffer your chargers

MAX charges from a small supply and runs new or existing chargers at full speed.

J&M Murdoch: DC fast charging from 32A. £300k grid upgrade deferred, live in a day.

Electric excavator charging from SiteCharge units powered by Allye MAX500s at Lower Thames Crossing
Mobile · Off-grid

Charge standalone

Chargers built into MAX, recharged from a DC charger, another MAX or a generator.

Lower Thames Crossing: four MAX500s charge excavators, no grid. Over £30k a week saved.

Each DC charger has two outlets. The power quoted is the total, shared when two vehicles plug in.

Save £300,000 upfront

and start electrifying years sooner, at J&M Murdoch's Glasgow depot, deployed in one day

Average UK site grid upgradeRange £150k to £3m£500,000
Typical wait for a connectionUp to 15 years1 to 3 years
Grid capacity neededWith a battery buffer50 to 80% less
65%cheaper than an upgrade
1.28MWintegrated DC charging
£130kdiesel saved a year

Sources: Allye case studies; SMMT (May 2025); US Joint Office of Energy and Transportation and NREL (June 2024).

Charging

From cars and vans to 44‑tonne trucks

We supply

DC charging from 60kW to 1.28MW, with two outlets so two vehicles charge at once.

Your choice

Specify your preferred brand of charger, and we do the integration.

Why Allye

Made for depots

An option for every site

Small or large, fixed or mobile: MEV at the depot, MAX for site power and charging wherever the work is.

Running in hours

Delivered tested and ready: charging within hours of arrival. Add units as your fleet grows.

Software that learns your site

Machine learning predicts load and AI schedules every half hour of charging and discharging.

Open to the markets

Open API for third-party optimisers, so MAX and MEV earn from grid flexibility and wholesale prices.

Lower-carbon hardware

Built in Britain from EV batteries already on our roads: 60% lower embedded CO2 than new cells.

Safe and supported

CE and UKCA marked, every cell monitored 24/7, supported by the UK engineers who built it.

FAQ

Questions buyers ask

Can MAX charge EVs without a grid upgrade?

Yes. MAX stores energy slowly from the supply you already have, even a 32A connection, and delivers it at high power when vehicles plug in. J&M Murdoch runs DC fast charging from a 32A supply and deferred a £300k grid upgrade.

How much charging power can MAX deliver?

DC charging runs from 60kW up to 1.28MW across the range, with two outlets: MAX300 up to 400kW, MAX500 up to 480kW, MAX1000 and MAX1500 up to 1.28MW. MAX300 and MAX500 add 4 x 22kW AC. The power quoted is the total, shared when two vehicles plug in.

Can MAX power the chargers we already have?

Yes. As a buffer, MAX boosts satellite chargers on site, or charges vehicles directly from its own outlets.

Does MAX need a grid connection at all?

No. Off-grid, MAX recharges from any public or depot DC charger, another MAX or a generator. At Lower Thames Crossing, four MAX500s charge electric excavators with no grid connection.

Electrify your depot this year

Tell us your vehicles, duty cycles and supply. We'll size the charging and show what it saves against a grid upgrade.

  1. A free depot charging model
  2. A comparison against your grid upgrade quote
  3. The full MAX brochure and specifications

sales@allye.com+44 (0)20 805 06560

Your site or depot

Half-hourly meter data helps us model your site. Email it to sales@allye.com after you submit.

We use these details only to reply to your enquiry.