Horizon Plant
Hybrid power for tower cranes, with 70% less fuel.
70% less fuel£1,500 a week saved per tower crane
The challenge
What they faced
Tower cranes need high power for seconds at a time, so their generators are sized for the peak and burn fuel all day at low load. Horizon Plant wanted to cut fuel and emissions without losing performance.
What we deployed
How MAX solved it
Mobile MAX units run in hybrid with tower crane generators on construction sites and at venues including Dublin Zoo. MAX carries the base load and the start-up peaks; the generator runs only to recharge it.
70%less fuel
£1,500fuel saved per week
£76,500a year per crane, over a 45-week contract

"Class-leading product and service with lightning-fast response whenever we need them."David O'Neill, Horizon Plant



Want results like these?
Tell us about your site and we'll model the savings before you commit.
sales@allye.com+44 (0)20 805 06560