Skip to content

EV charging

Rapid charging without the grid upgrade.

Store energy slowly from the supply you have, release it fast. MEV at the depot, MAX anywhere.

Three ways to charge

Choose the one that fits your site.

Allye MEV chargers in a van depotMEV · At the depot

A dedicated rapid charger at the depot

200 or 300kW of DC charging from one moveable unit that recharges from the supply you already have.

Explore MEV
Allye MAX300s buffering separate chargers at a depotMAX · Buffer

Power the chargers you choose

MAX feeds a row of separate DC chargers at full speed from a small supply. Specify your brand; we do the integration.

Explore MAX
Allye MAX300 charging vans from its integrated chargersMAX · Anywhere

Integrated charging, on or off-grid

Up to 1.28MW DC built into MAX, charging vehicles where there is no grid at all, and recharging without diesel.

Explore MAX

Charging outputs

From 60kW to 1.28MW.

Each DC charger has two outlets. The power quoted is the total, shared when two vehicles plug in.

MEV · Battery-buffered charging

MEV200200kW

Two CCS2 connectors

MEV300300kW

Two CCS2 connectors

MAX · Battery energy storage

MAX300400kW

DC options from 60kW, plus AC

MAX500480kW

DC options from 60kW

MAX10001.28MW

DC options from 180kW

MAX15001.28MW

DC options from 180kW

Built for every vehicle

800V speed. Open standards.

  • 800V, serving 400V and 800V vehicles
  • OCPP 1.6J and 2.0.1 for any back office
  • ISO 15118 Plug and Charge on MEV
  • MID metering and contactless payment on MEV
  • Recharges off-peak, charges vehicles at the peak
An Allye MEV in a depot yard

Recharging MAX

Recharge without diesel.

Zero diesel

DC recharging

From any DC charger or another MAX: a MAX300 in just over an hour.

Less diesel

Hybrid with a generator

The generator runs only to recharge, at its most efficient load, starting automatically.

No upgrade

From a small supply

Recharge from a small site supply while MAX carries the load.

MAX300 control panel with its DC recharge socketMAX300 recharging from a public DC rapid charger

Charge your fleet without the grid upgrade.

Tell us about your vehicles and your supply, and we'll recommend MEV, MAX or both.

sales@allye.com+44 (0)20 805 06560

Your site or depot

Half-hourly meter data helps us model your site. Email it to sales@allye.com after you submit.

We use these details only to reply to your enquiry.