Capacity sold. Grid connection: 2030.

Bridge the wait for the grid. Without diesel.

Battery power that runs extra load on the supply you already have, until the new connection arrives.

Backup in under 40msNo diesel bridgeParallel for megawatts

The problem

The grid can't keep up with demand

Data halls are ready years before the connection is. Every year of waiting is revenue lost.

On-grid Data centres and AI compute halls

The queue

125GW of demand was waiting to connect in Great Britain by June 2025.

The wait

3 to 7 years for a data centre connection, up to a decade in London.

Diesel bridges

Hire and fuel for a 1MVA diesel bridge cost around £400,000 a year.

Revenue on hold

Colocation earns about $2.6m per MW a year, deferred until power.

How it works

Run more on the supply you have

MAX1500 covers the gap between your load and your connection, and protects it at the same time.

Store

Recharge overnight from the supply you already have.

Bridge

Cover the deficit: 760kW above a 500kW supply for 1hr 45min.

Protect

SyncFlow takes over in under 40ms and conditions the supply.

Save £200,000 a year

£800,000 over a four-year wait for a connection, against diesel bridge power

Diesel bridge power1MVA generator hire and fuel£400,000
MAX1500Lease and grid electricity£197,000
Deficit covered each day760kW on a 500kW supply1hr 45min
1.5MWhstorage per MAX1500 unit
1.26MWcontinuous power per unit
<40msswitchover in an outage

Assumes a 1.26MW load on an existing 500kW supply. Queue data from Ofgem and NESO; revenue from Avanza Energy (Aug 2026). There is no Allye data centre deployment yet; this is a worked example.

Scale

Grows with your hall

No limit

Add units as the hall fills, and mix different models on one site.

<2 min

off a hooklift truck, then redeployed when the grid arrives.

Why MAX

Made for critical power

Highest power in the range

MAX1500 delivers 1.5MWh and 1.26MW continuous from a single 20ft footprint.

Seamless switchover

SyncFlow transfers the load in under 40ms and conditions supply for the servers.

No pad or crane

Drop and Go from a hooklift truck; no concrete pad, fencing or groundworks.

Software that learns your site

Machine learning predicts load and AI schedules every half hour of charging and discharging.

Lower-carbon hardware

Built in Britain from EV batteries already on our roads: 60% lower embedded CO2 than new cells.

Safe and supported

CE and UKCA marked, every cell monitored 24/7, supported by the UK engineers who built it.

FAQ

Questions buyers ask

Can a battery bridge a delayed grid connection?

Yes. In our worked example, a MAX1500 runs a 1.26MW hall from an existing 500kW supply, covering a 760kW deficit for 1 hour 45 minutes a day and recharging overnight.

How does it compare with diesel bridge power?

Modelled at £197,000 a year for a MAX1500 lease and grid electricity, against around £400,000 for a 1MVA diesel bridge: £200,000 a year saved.

What happens when the new connection arrives?

MAX drops off a hooklift truck in under two minutes and is redeployed to the next site.

Start earning before the grid arrives

Tell us your hall's load, your current supply and your connection date. We'll model the bridge.

  1. A free bridging model for your site
  2. A comparison against your diesel bridge quote
  3. The full MAX brochure and specifications

sales@allye.com+44 (0)20 805 06560

Your site

Half-hourly meter data helps us model your site. Email it to sales@allye.com after you submit.

We use these details only to reply to your enquiry.