Why we built MEV
MEV started with a £300,000 grid quote at a refuse depot in Glasgow. A MAX300 deferred that upgrade in a day. MEV turns what we learned there into a dedicated charger: up to 400kW for two vehicles at once, from the supply a depot already has.
3 November 2026 · 4 min read
The grant buys the charger. Here is what powers it.
Round 2 of the Depot Charging Scheme is expected to open on 28 October. It part-funds chargers, but not the grid connection that runs them. At J&M Murdoch in Glasgow, a 32A supply now runs DC fast charging, and a £300,000 upgrade has been deferred.
21 October 2026 · 3 min read
It isn't the machine. It's the power.
Electric excavators are ready. Site power isn't. Here is how contractors, hire fleets and dealers are charging electric plant with no grid connection, and what nine months with the Bouygues Murphy JV on the Lower Thames Crossing has shown.